Edinburgh Research Archive logo

Edinburgh Research Archive

University of Edinburgh homecrest
View Item 
  •   ERA Home
  • Engineering, School of
  • Engineering, School of
  • Engineering thesis and dissertation collection
  • View Item
  •   ERA Home
  • Engineering, School of
  • Engineering, School of
  • Engineering thesis and dissertation collection
  • View Item
  • Login
JavaScript is disabled for your browser. Some features of this site may not work without it.

Old British breakwaters: how have engineering developments influenced their survival?

View/Open
AllsopNWH_2021.pdf (7.795Mb)
Date
27/11/2021
Author
Allsop, Nigel William Henry
Metadata
Show full item record
Abstract
This research analysed UK harbour breakwaters constructed between 1663 to 1910. It includes a breakwater built in Tangier from 1663, to Dover outer harbour completed in 1910. The period of main interest is 1840-1900, and the structures studied have been narrowed to vertical (or nearly vertical) walls on rubble foundations. The principal research activity has been to distil from historical literature the key reasons for past failures and successes. In doing so, the research has reviewed the construction and performance of breakwaters protecting a number of harbours of refuge, discussed in a paper in ICE Engineering History. Other results of the historical research were: generic guidance; geographic data on breakwaters around the UK; details of their design, construction, and performance, derived from historical manuals, reviews of historical structures, and professional papers and discussions. These were followed by stability analysis using empirical formulae to determine factors of safety for breakwaters at Wick (failed), Alderney (partly failed), and Dover (successful). These have demonstrated why the outer end of Wick breakwater failed catastrophically, and confirmed how robust are the outer breakwaters at Dover. The marginal stability results for Alderney confirm the reasons behind frequent damage leading to the abandonment of its outer end. Historical records identify that designers of the period had no robust methods to predict waves, or their transformations. Even when engineers had decided what size or form of wave needed to be resisted, they did not then have reliable methods to calculate wave forces. As if that was not bad enough, the engineers of the day did not know how to make marine concrete, they had no steam power to move materials, nor the equipment to place foundation blocks underwater. So advances were by trial and error. After 1836, improvements were substantially assisted by ICE papers and the formal discussions at ICE. Probably the most important change was to lower the rubble mound foundation for the masonry wall. The further underwater that this junction could be placed, the more stable (and thus long-lasting) the structures became. Achieving this in practice however required new materials, construction tools, and methods. During the latter period, there were substantial developments: of cement to make concrete; of steam power to lift and move heavy items; concrete mixers to make concrete in bulk; and diving equipment to allow underwater working. A very curious omission is that solutions to some of these problems were used at Tangier before 1680, but that breakwater was destroyed in the military withdrawal, and almost no trace was left in the technical literature. A different route was where the rubble slope was extended so that its crest was well clear of the water, as at Plymouth, Holyhead, Portland, and (in part) Cherbourg, precursors to modern rubble mound breakwaters, but of little further interest to this project. The research described here has concentrated primarily on the improvements in knowledge, materials, and construction techniques that moved breakwater engineering from the frequent failures of Alderney breakwater, to the robust survival of Dover outer breakwaters. As well as informing the onset and progress of damage under wave attack on unbonded blockwork walls, model studies present new data and prediction equations for wave transmission over failed blockwork breakwaters to predict the residuary protection available when such structures are damaged or collapse. The thesis is in two main parts. Part 1 summarises evidence on design, construction and performance; develops concepts of failure and success; analyses selected breakwaters; and draws conclusions to the research questions. Part 2 reviews the historical literature to summarise what our predecessors were trying to construct; what materials and tools they had at their disposal; what hydrodynamic processes they understood (or did not); and to what extent (and how) did they share knowledge and understanding. The thesis is supported by Appendices summarising the historical timeline, identifying many UK breakwater locations, and some of the key engineers of the period.
URI
https://hdl.handle.net/1842/38368

http://dx.doi.org/10.7488/era/1633
Collections
  • Engineering thesis and dissertation collection

Library & University Collections HomeUniversity of Edinburgh Information Services Home
Privacy & Cookies | Takedown Policy | Accessibility | Contact
Privacy & Cookies
Takedown Policy
Accessibility
Contact
feed RSS Feeds

RSS Feed not available for this page

 

 

All of ERACommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsPublication TypeSponsorSupervisorsThis CollectionBy Issue DateAuthorsTitlesSubjectsPublication TypeSponsorSupervisors
LoginRegister

Library & University Collections HomeUniversity of Edinburgh Information Services Home
Privacy & Cookies | Takedown Policy | Accessibility | Contact
Privacy & Cookies
Takedown Policy
Accessibility
Contact
feed RSS Feeds

RSS Feed not available for this page