Edinburgh Research Archive

Risk Management In Major Projects

dc.contributor.advisor
Ponniah, DA
en
dc.contributor.advisor
Hardy, MSA
en
dc.contributor.author
Baker, Scott William
en
dc.contributor.sponsor
Amerada Hess Ltd
en
dc.date.accessioned
2005-01-25T15:59:50Z
dc.date.available
2005-01-25T15:59:50Z
dc.date.issued
1997-07
dc.description.abstract
The integration of risk management in major projects within the construction and oil and gas industries has never been more significant especially as these projects are becoming larger and more complex. The increased requirement for risk to be efficiently managed is also supported by the inflated amount of legislation in this area, mainly due to incidents like the Piper Alpha installation in 1988. Hence risk management is developing into a multifarious process which needs continual update throughout the project’s life. Even though the legislation has expanded, there is still no standardisation to which the firms are to perform risk management. Therefore, improvements to the techniques that are used are possible and necessary. Current methods are too conservative resulting in substantial costs and less understanding about the risks themselves. Therefore, more detailed risk management techniques are imperative. This thesis determines the five steps of risk management which are essential to achieve a controlled risk environment. The research involves an in-depth questionnaire canvassing the largest companies within the construction and the oil and gas industries in the UK, who are constantly involved with major projects. The questionnaire ascertains important information which will assist companies in selecting the most pertinent and successful techniques for each of the five steps. A case study from the oil industry is introduced and proposals are made to improve the quantitative risk analysis methodology. This, in turn, will aid the decision making process when confronted with technical risks and will ultimately produce a more controlled risk environment. In addition, valuable information will be gained due to a better understanding of the risks as well as maximising profits. A new risk analysis method is subsequently derived which is based on the use of the @RISK package. It is intended that the results of this thesis will be incorporated in future risk analyses.
en
dc.format.extent
572702 bytes
en
dc.format.extent
503833 bytes
en
dc.format.extent
1392213 bytes
en
dc.format.extent
724104 bytes
en
dc.format.extent
3025797 bytes
en
dc.format.extent
3889262 bytes
en
dc.format.extent
801500 bytes
en
dc.format.extent
3366031 bytes
en
dc.format.extent
2831878 bytes
en
dc.format.extent
305784 bytes
en
dc.format.extent
185529 bytes
en
dc.format.extent
857583 bytes
en
dc.format.extent
9799 bytes
en
dc.format.extent
9944 bytes
en
dc.format.extent
13679 bytes
en
dc.format.extent
11996 bytes
en
dc.format.extent
39075 bytes
en
dc.format.extent
155070 bytes
en
dc.format.extent
8003 bytes
en
dc.format.extent
106779 bytes
en
dc.format.extent
42990 bytes
en
dc.format.extent
62408 bytes
en
dc.format.extent
40505 bytes
en
dc.format.extent
26112498 bytes
en
dc.format.extent
928936 bytes
en
dc.format.extent
1835086 bytes
en
dc.format.extent
4211925 bytes
en
dc.format.extent
243347 bytes
en
dc.format.extent
12834305 bytes
en
dc.format.mimetype
application/pdf
en
dc.format.mimetype
application/pdf
en
dc.format.mimetype
application/pdf
en
dc.format.mimetype
application/pdf
en
dc.format.mimetype
application/pdf
en
dc.format.mimetype
application/pdf
en
dc.format.mimetype
application/pdf
en
dc.format.mimetype
application/pdf
en
dc.format.mimetype
application/pdf
en
dc.format.mimetype
application/pdf
en
dc.format.mimetype
application/pdf
en
dc.format.mimetype
application/pdf
en
dc.format.mimetype
application/pdf
en
dc.format.mimetype
application/pdf
en
dc.format.mimetype
application/pdf
en
dc.format.mimetype
application/pdf
en
dc.format.mimetype
application/pdf
en
dc.format.mimetype
application/pdf
en
dc.format.mimetype
application/pdf
en
dc.format.mimetype
application/pdf
en
dc.format.mimetype
application/pdf
en
dc.format.mimetype
application/pdf
en
dc.format.mimetype
application/pdf
en
dc.format.mimetype
application/pdf
en
dc.format.mimetype
application/pdf
en
dc.format.mimetype
application/pdf
en
dc.format.mimetype
application/pdf
en
dc.format.mimetype
application/pdf
en
dc.format.mimetype
application/pdf
en
dc.identifier.uri
http://hdl.handle.net/1842/655
dc.language.iso
en
dc.relation.hasversion
BAKER S.W. and PONNIAH D.A., A UK Survey Of Risk Analysis in Major
en
dc.relation.hasversion
BAKER S.W., PONNIAH D.A. and SMITH S., Risk Response Techniques
en
dc.relation.hasversion
BAKER S.W., PONNIAH D.A. and SMITH S., Techniques for the Analysis of
en
dc.relation.hasversion
BAKER S.W. and PONNIAH D.A., Summary of the published paper ‘Risk
en
dc.relation.hasversion
BAKER S.W., PONNIAH D.A. and SMITH S., A Survey of Risk Management
en
dc.subject.other
Risk Management
en
dc.subject.other
Projects
en
dc.title
Risk Management In Major Projects
en
dc.type
Thesis or Dissertation
en
dc.type.qualificationlevel
Doctoral
en
dc.type.qualificationname
PhD Doctor of Philosophy
en

Files

Original bundle

Now showing 1 - 5 of 29
Name:
baker-refs.pdf
Size:
559.28 KB
Format:
Adobe Portable Document Format
Description:
References
Name:
baker1.pdf
Size:
492.02 KB
Format:
Adobe Portable Document Format
Description:
Introduction
Name:
baker2.pdf
Size:
1.33 MB
Format:
Adobe Portable Document Format
Description:
Literature Survey
Name:
baker3.pdf
Size:
707.13 KB
Format:
Adobe Portable Document Format
Description:
Questionnaire on Risk Analysis
Name:
baker4.1to4.5.pdf
Size:
2.89 MB
Format:
Adobe Portable Document Format
Description:
Analysis of the RMQ

This item appears in the following Collection(s)