Consultants Interim Report: Cockerell Raft (Draft)
dc.contributor.author
DEPARTMENT OF ENERGY: WAVE ENERGY STEERING COMMITTEE (UNITED KINGDOM WAVE ENERGY PROGRAMME)
en
dc.contributor.author
Rendel, Palmer & Tritton, Consulting Engineers
en
dc.contributor.author
Kennedy & Donkin, Consulting Engineers
en
dc.date.accessioned
2020-10-08T12:38:30Z
dc.date.available
2020-10-08T12:38:30Z
dc.date.issued
1979
dc.date.issued
1979-11
dc.description.abstract
Last year, due to the lack of time for many of the Device Teams to advance their work to an adequate stage, it was necessary for the Consultants themselves to generate much of the information required for their report. The basic work included the development of reference designs from information supplied by the Teams to a degree of detail sufficient for quantities to be taken off and for productivity to be assessed and the cost of power to be calculated. This year the Device Teams are responsible for the reference designs, with the Consultants commenting upon the schemes and the data presented. The stage of development reached by the various Device Teams differs widely due to the varying starting dates and resources. In addition, the philosophy adopted by the Device Teams in their approach to presentation leads to differing emphases or degrees of optimism when considering the data available to them. The Consultants feel that it is an important part of their task to comment on devices from a common standpoint and in particular to differentiate between facts established by the Teams and the ideas and hypotheses which they introduce to complete their presentation. In view of this, it was considered essential to establish the scope and degree of development of the various key aspects related to each device. The first section of this report sets out to present the full range of information available to the Consultants, together with its status as judged by its suitability and degree of completeness for incorporation in the development of a reference design which can be assessed and costed. The second part of this report contains the Consultants' appraisal of the information, discussed under the most significant headings. In order to avoid contention, this report in draft form has been discussed with the Device Team. There is no disagreement as regards the extent and status of the information made available to the Consultants and, except where specifically noted, the Consultants' appraisal has been generally accepted. NOTE: THIS REPORT IS TO BE READ IN CONJUNCTION WITH THE DEVICE TEAM'S REPORTS. THE CONSULTANTS HAVE NOT REPRODUCED THE DEVICE TEAM'S DRAWINGS IN THIS REPORT.
en
dc.identifier.uri
https://hdl.handle.net/1842/37352
dc.identifier.uri
http://dx.doi.org/10.7488/era/638
dc.publisher
DEPARTMENT OF ENERGY: WAVE ENERGY STEERING COMMITTEE (UNITED KINGDOM WAVE ENERGY PROGRAMME)
en
dc.subject
Wave energy
en
dc.subject
Device
en
dc.title
Consultants Interim Report: Cockerell Raft (Draft)
en
dc.type
Report/Report part
en
Files
Original bundle
1 - 1 of 1
- Name:
- CONSULTANTS INTERIM REPORT COCKEREL RAFT NOVEMBER 1979.pdf
- Size:
- 22.32 MB
- Format:
- Adobe Portable Document Format
This item appears in the following Collection(s)

