Dynamic modelling of generation capacity investment in electricity markets with high wind penetration
dc.contributor.advisor
Harrison, Gareth
en
dc.contributor.advisor
Bialek, Janusz
en
dc.contributor.author
Eager, Daniel
en
dc.contributor.sponsor
Natural Environment Research Council (NERC)
en
dc.date.accessioned
2012-08-08T14:31:34Z
dc.date.available
2012-08-08T14:31:34Z
dc.date.issued
2012-06-25
dc.description.abstract
The ability of liberalised electricity markets to trigger investment in the generation capacity required
to maintain an acceptable level of security of supply risk has been - and will continue to
be - a topic of much debate. Like many capital intensive industries, generation investment suffers
from long lead and construction times, lumpiness of capacity change and high uncertainty.
As a result, the ‘boom-and-bust’ investment cycle phenomenon, characterised by overcapacity
and low prices, followed by power shortages and high prices, is a prominent feature in the debate.
Modelling the dynamics of generation investment in market environments can provide
insights into the complexities involved and address the challenges of market design.
Further, many governments who preside over liberalised energy markets are developing policies
aimed at promoting investment in renewable generation. Of particular interest is the mix and
amount of generation investment over time in response to policies promoting high penetrations
of variable output renewable power such as wind. Consequently, improved methods to calculate
expected output, costs and revenue of thermal generation subject to varying load and random
independent thermal outages in a power system with a high wind penetration are needed.
In this interdisciplinary project engineering tools are applied to an economic problem together
with knowledge from numerous other disciplines. A dynamic simulation model of the aggregated
Great Britain (GB) generation investment market has been developed. Investment is
viewed as a negative feedback control mechanism with current and future energy prices acting
as the feedback signal. Other disciplines called upon include the use of stochastic processes
to address uncertainties such as future fuel prices, and economic theory to gain insights into
investor behaviour. An ‘energy-only’ market setting is used where generation companies use
a classical NPV approach together with the Value at Risk criterion for investment decisions.
Market price mark-ups due to market power are also accounted for.
The model’s ability to simulate the market trends witnessed in GB since early 2001 is scrutinised
with encouraging findings reported. A reasonably good agreement of the model with
reality, gives a degree of confidence in the realism of future projections. An advancement to
the dynamic model to account for expected high wind penetrations is also included. Building
on the initial model iteration, the short-term energy market is simulated using probabilistic
production costing based on theMix of Normals distribution technique with a residual load calculation
(load net of wind output). Wind speed measurement data is combined with the outputs
of atmospheric models to assess the availability of the GB wind resource and its relationship
with aggregate load.
Simulation results for 2010-40 suggest that the GB system may experience increased generation
adequacy risk during the mid to late the 2020s. In addition, many new investments are unable to
recover their fixed costs. This triggered an investigation into the design of a capacity mechanism
within the context of the modelling environment. In light of the ongoing GB market electricity
market reform debate, two mechanisms are tested; a strategic reserve tender and a marketwide
capacity market. The goal of these mechanisms is to mitigate generation adequacy risk
concerns by achieving a target winter peak de-rated capacity margin.
en
dc.identifier.uri
http://hdl.handle.net/1842/6264
dc.language.iso
en
dc.publisher
The University of Edinburgh
en
dc.relation.hasversion
D. Eager, J. Bialek, and T. Johnson, ‘Validation of a Dynamic Control Model to Simulate Investment Cycles in Electricity Generating Capacity’, Proceedings of the IEEE Power and Energy Society General Meeting, Minneapolis, Minnesota, US, July 2010, pp. 391- 394.
en
dc.relation.hasversion
S. Hawkins, D. Eager and G. P. Harrison, ‘Characterising the Reliability of Production from Future British Offshore Wind Fleets’, Proceedings of the Renewable Power Generation Conference, IET, Edinburgh, UK, September 2011.
en
dc.relation.hasversion
D. Eager, B. F. Hobbs, and J. W. Bialek, ‘Dynamic Long-Term Modelling of Generation Capacity Investment and Capacity Margins: a GB Market Case Study’, University of Cambridge, Electricity Policy Research Group Working Paper Series, no. 1201, January 2012.
en
dc.subject
power generation economics
en
dc.subject
Mix of Normals distribution
en
dc.subject
thermal power generation
en
dc.subject
wind power generation
en
dc.title
Dynamic modelling of generation capacity investment in electricity markets with high wind penetration
en
dc.type
Thesis or Dissertation
en
dc.type.qualificationlevel
Doctoral
en
dc.type.qualificationname
PhD Doctor of Philosophy
en
This item appears in the following Collection(s)